Our Project Portfolio

LEGEGERU INDUSTRIES

Synthesis & definition of physical design of the mobile elevated working platforms (MEWP) to be used by Transnet for maintenance of their Locomotives

ENGINEERED GEARS

Modal analysis of an all-inclusive (casing, rotor, windings, rotor & stator steel cores) 310kW Traction Motor

LEGEGERU INDUSTRIES

Design of an extending section of MEWP

DELFT ENGINEERING

Design of a pump station & dedicated fire tank for Mototolo Concentrate

ENGINEERED GEARS

Cooling analysis of 310kW Traction Motor

ABBEY HLUMBANE

Design of bathtub lifting chair

DELFT ENGINEERING

Root-cause identification of failure of the screen cross beams at Anglo American Platinum, Amandelbult Production Service

THARISA MINE

Root-cause identification of failure of Genesis Jaw Superstructure at Tharisa Mine

TIVANATHI ENGINEERING

Root-cause identification of Transnet Locomotive Derailment at Ermelo, Yard A Control Point 7

TIVANATHI ENGINEERING

Vaalriver Barridge safety inspection

TIVANATHI ENGINEERING

Tent safety inspection before church service in Soweto

TIVANATHI ENGINEERING

Engineering Visual Audit of Rand Water Panfontein Sludge Disposal Facility

COENG

Evaluation & validation of Galison Stope Grizzly for blasting mission profile at Lonmin Marikana Mine

SIF PROJECTS

Synthesize & definition of physical design of the vibrating feeder support superstructure for Moab Khotsong Mine

TIVANATHI ENGINEERING

Evaluation & validation of a design of charge bucket bogie belonging to Scaw Metal

SIBANYE-STILLWATER

Design of horizontal life line for maintenance of Flotation Cells at Sibanye-Stillwater, Rustenburg Service Operations

SIF PROJECTS

Design of counterweight of conveyor sampler for Moab Khotsong Mine

COENG

Assessment of pump & NRV failures during fuel offloading from the Wagons at Shell Depo in Nelspruit

COENG

Concentrator plant owners’ team at Bakubung Platinum Mine

AVERNIGROUP

Hydraulic design of a section of Rand Water Gravity Main in Mamelodi

SIMON MILLER

Design & installation of nitrate removal system for portable water

COENG

Upgrade of wet spent grain silo for SAB Brewery in Alrode Plant

MANGETHE GROUP

Phase 5 HVAC professional engineering service for Telkom North Tower & Annex Buildings

COENG

Design review of the de-watering 450NB expansion pipe piece used at the end of a 13.5km pipeline at Anglo American Mine

SIF PROJECTS

Design of a compressed air column for Great Nolingwa Mine

TIVANATHI ENGINEERING

Design review of efficiency, water and mass balance of Rand Water Panfontein Sludge Disposal Facility

SIF PROJECTS

Design of a dewatering column for Great Nolingwa Mine